SAFETY

GB_JRJ_Logo.png

COMMITED TO

| SAFETY

| HEALTH

| ENVIRONMENT

GOAL OF ZERO INCIDENTS​ ON EVERY PROJECT.

FOR GALLANT, SAFETY IS A CORE VALUE.

 

OUR SAFETY BY DESIGN PROCESS ENSURES A STEADFAST FOCUS ON PROJECT SAFETY.

LAGGING INDICATORS

ALTHOUGH REACTIVE IN NATURE, GALLANT BUILDERS USES LAGGING INDICATORS TO INDICATE PROGRESS TOWARD COMPLIANCE WITH SAFETY RULES AND PROCEDURES.

THESE BOTTOM LINE NUMBERS EVALUATE THE OVERALL EFFECTIVENESS OF OUR SAFETY SYSTEMS AND GIVE US A METRIC TO CONTINUALLY IMPROVE OUR PROGRAM.

INCIDENT - 507,237 AND COUNTING

TRIR - 0.00 SINCE THE BEGINNING

LTRIR - 0.00 SINCE THE BEGINNING

EMR - CONTINUES TO TREND DOWN YEAR AFTER YEAR

2013 - 1.00

| 2014 - .92

| 2015 - .90

| 2016 - .85

| 2017 - .80

| 2018 - .76

THE PROOF IS IN THE NUMBERS

LEADING INDICATORS

Leading indicators have been designed to ensure appropriate attention to health and safety risk identification and management on our project sites. Our focus is on verification - of the existence of safety procedures, risk control and people’s understanding of potential hazards. We understand that communication is vital to ensure everyone is kept well informed and safe, and that accountability from our leadership is key. Our leading indicators respond to these focus areas, all of which respond to the implementation of preventative measures identified by Gallant Safety Committee.

  • Leadership inspection tours: In order to actively demonstrate leadership and to visibly show our workforce that we care about their safety and wellbeing, requirements in relation to leadership inspection tours.

  • Self-verification assessments: To ensure that the management and verification on our projects is as rigorous as it should be, business leaders to undertake a self-assessment audit of project site HSE plans and critical activity HSE management.

  • Independent and Third Party Audits:  To ensure that our HSE program and audits are in depth, we utilize individual HSE internal audits as well as third party safety consultants. These independent audits are in-depth risk based audits of our all projects, specifically high risk projects.

SAFETY BY DESIGN

A 5-STEP PROCESS

 1: DEFINE SAFETY GOALS

 

HELP MAINTAIN FOCUS THROUGHOUT THE PROCESS AND REFLECT REGULATORY REQUIREMENTS, LEGISLATION, AND PROJECT-SPECIFIC RISK CRITERIA AND SUSTAINABILITY STRATEGIES, AS WELL AS PROJECT SPECIFIC SAFETY AND ENVIRONMENTAL AIMS

CONSTRUCTION PRINCIPLES

| ELIMINATE - REMOVE HAZARDOUS MATERIALS, PROCESSES AND ACTIVITIES, TO ELIMINATE HAZARDS OR THE USE OF MATERIALS OR ENERGY COMPLETELY

| MINIMIZE - HAZARDOUS SUBSTANCES AND ACTIVITIES, REDUCE THE MAGNITUDE OF USE SUFFICIENTLY TO ELIMINATE THE NEED FOR ELABORATE SAFETY OR ENVIRONMENTAL

MANAGEMENT SYSTEMS.

| SUBSTITUTE - REPLACE HAZARDOUS, EXPENSIVE OR RARE MATERIALS WITH OTHER OPTIONS

| MODERATE - MINIMIZE THE POTENTIAL IMPACT OF A RELEASE OF SUBSTANCES, MATERIALS OR ENERGY, E.G. BY CHANGING LAYOUT CONFIGURATION, ADOPTING LESS HAZARDOUS OPERATING CONDITIONS 

| SIMPLIFY - DESIGN FACILITIES TO REDUCE OR ELIMINATE COMPLEXITY AND MINIMIZE THE POSSIBILITY OF HUMAN ERROR

INDUSTRY AFFILIATIONS

arrow2.png
image6.png
image4.png
image14.jpeg
image8.png
image13.png
image7.png
image12.jpeg
image11.png
image5.png
image15.jpeg
image10.jpeg
image9.png
plant1.png

CONTACT

GALLANT G.png

MAIN OFFICE

6990 PORTWEST DRIVE SUITE 170

HOUSTON, TX 77024

MIDSTREAM BUSINESS PARK

2830 FM 565 SUITE 100

MONT BELVIEU, TX 77580

TEL: 713.275.9900

FAX: 713.275.9901

bottom of page